This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
main:bgqprocessasampleset [2018/11/27 19:00] rlu45 |
main:bgqprocessasampleset [2019/01/09 21:05] rlu45 |
||
---|---|---|---|
Line 24: | Line 24: | ||
===== Monitor progress ===== | ===== Monitor progress ===== | ||
- | After setting | + | After providing |
<WRAP group> | <WRAP group> | ||
<WRAP half column> | <WRAP half column> | ||
- | In this dialog, the top grouping box displays the detailed progress information for the particular job currently being selected in the drop-down list, with the progress bar graphically showing the percentage progress of this job. | + | In this monitoring |
- | * ‘Status’ label: the current status of the job, among three possible | + | * ‘Status’ label: the current status of the job, among three possible |
* ‘Elapsed time’ label: how long the job has been running for. | * ‘Elapsed time’ label: how long the job has been running for. | ||
* ‘Completed samples’ label: the number of completed samples in this job to date/the total number of samples in this job. | * ‘Completed samples’ label: the number of completed samples in this job to date/the total number of samples in this job. | ||
Line 61: | Line 61: | ||
</ | </ | ||
+ | ===== Download result matrices of samples in a processed sample set ===== | ||
+ | After finishing processing a sample set, you can download the result matrices of the contained samples to your local computer, then you can open them and perform further processing in the desktop ADCI software (e.g. estimating doses using additional calibration curves). To do this, first click the processed sample set in the scenario tree, then click the ' |