This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
main:bgqprocessasampleset [2018/11/27 19:00] rlu45 |
main:bgqprocessasampleset [2018/11/27 19:19] rlu45 |
||
---|---|---|---|
Line 24: | Line 24: | ||
===== Monitor progress ===== | ===== Monitor progress ===== | ||
- | After setting | + | After providing |
<WRAP group> | <WRAP group> | ||
<WRAP half column> | <WRAP half column> | ||
- | In this dialog, the top grouping box displays the detailed progress information for the particular job currently being selected in the drop-down list, with the progress bar graphically showing the percentage progress of this job. | + | In this monitoring |
- | * ‘Status’ label: the current status of the job, among three possible | + | * ‘Status’ label: the current status of the job, among three possible |
* ‘Elapsed time’ label: how long the job has been running for. | * ‘Elapsed time’ label: how long the job has been running for. | ||
* ‘Completed samples’ label: the number of completed samples in this job to date/the total number of samples in this job. | * ‘Completed samples’ label: the number of completed samples in this job to date/the total number of samples in this job. |