Differences
This shows you the differences between two versions of the page.
|
Last revision
Both sides next revision
|
main:dosereport [2017/03/06 19:07] 127.0.0.1 external edit |
main:dosereport [2017/08/04 14:01] bshirley |
[[main:estimatedose | Dose estimation]] steps must be performed before generation of this report. Dose estimation reports are generated based on the contents of the plot. Thus, a plot generated when dose estimation is performed must be present in the plot area at the time a report is generated. | [[main:estimatedose | Dose estimation]] steps must be performed before generation of this report. Dose estimation reports are generated based on the contents of the plot. Thus, a plot generated when dose estimation is performed must be present in the plot area at the time a report is generated. |
| |
After [[main:estimatedose | dose estimation]] has been performed, to open the dose estimation report generation dialog click “Report” in the menu bar at the top of the software window and select “Dose estimation report”. | After [[main:estimatedose | dose estimation]] has been performed, to open the dose estimation report generation dialog click “Report” in the menu bar at the top of the software window, access the “Dose Estimation” submenu and click "Internal Report". |
| |
<WRAP group> | <WRAP group> |